24/7 Sydney Emergency Sparky
0405 353 236
New Builds & ConstructionRough-In to Fit-Off

New Build & Construction Electrical

Complete residential electrical for new homes, granny flats, duplexes and knock-down rebuilds — from temporary builder's supply and rough-in through to fit-off, energisation and handover documentation.

  • Builder's Supply Arranged
  • On Programme, Not Ahead of It
  • Full Handover Pack
Call 0405 353 236
Electrical rough-in running through timber framing on a Sydney new buildRough-In Stage
New homes from $6,500 (per dwelling, by plan)Fixed Price From Plans
Where Build Electrical Costs Money

The Three Things That Blow a Build Budget

Electrical rarely blows out because of cable. It blows out because of decisions made too late.

!

Layout Decided After Rough-In

Moving a point once the linings are on means opening a wall that has been plastered and painted. Every point settled at rough-in costs a fraction of the same point settled at fit-off.

!

Supply Capacity Left Too Late

An all-electric home with induction, a heat pump and an EV charger can exceed what the existing service can carry. Finding that out at energisation means a network application on the critical path instead of months earlier.

!

No Provision for What Comes Next

A conduit to the garage and spare ways in the board cost almost nothing during construction. Retrofitting the same EV circuit through a finished slab and a lined wall is a different job at a different price.

From Slab to Handover

One contractor across the whole programme, so nothing falls between stages.

Electrician working on timber framing during a new build

Take-Off From Plans

A fixed price built from the drawings and the electrical layout, with the provisional items named as provisional rather than buried in a lump sum.

Temporary Builder's Supply

Site supply arranged and installed so the other trades have power from day one, and removed cleanly at handover.

Rough-In and Fit-Off

Cabling, conduits and points set out at frame stage, then fittings, switches and the board completed after linings — coordinated to the builder's programme.

Energisation and Handover

Network application, meter coordination, full testing to AS/NZS 3000, CCEW lodged, and a circuit schedule the owner can actually read.

New Build Questions

What builders and owner-builders ask before awarding the electrical.

Yes, and the process is the same: a take-off from your plans, a fixed price, and coordination against whatever programme you are running. Owner-builders usually want more explanation at each stage, which is included rather than charged for.

Pricing the Electrical on a Build?

Send the plans and the electrical layout and you will get a fixed price with the provisional items called out honestly.

Discuss the programme: 0405 353 236
Available Now • 24/7 DispatchNSW Lic #456652C
Call 0405 353 236