Commercial Fit-Out Electrical & Data
Offices, retail, hospitality venues and warehouses — one contractor for the distribution, the general light and power, the structured data with its MDF and IDF racks, the audio visual, and the electrical and data behind CCTV and access control.
- One Contractor, Every Service
- Programmed to the Build
- Certified for Handover
Tenancy Fit-OutThe Three Things That Delay a Handover
A fit-out rarely runs late because of cable. It runs late because of coordination, and all three of these are decided before anybody pulls a draw wire.
Four Trades, Four Contractors
Power, data, audio visual and security split across separate contractors means four programmes, four sets of containment fighting for the same ceiling space, and nobody accountable when the comms room is not ready for the racks.
Base Build Capacity Assumed, Not Checked
A tenancy taking more load than the base build allows for is discovered at commissioning, when the answer is a supply upgrade on the critical path. It is a metering and maximum demand question that has an answer during design.
Certification Left to the End
Emergency lighting logbooks, Fluke test results, as-builts and the CCEW all arrive at handover or they hold it up. Producing them stage by stage is the difference between a defect list and a set of keys.
Every Service a Tenancy Needs
Scoped from the drawings, programmed against the builder’s dates, and delivered by one contractor who answers for all of it.

Distribution & Sub-Mains
Tenancy boards, sub-mains and metering for separately billed suites, sized against a real maximum demand calculation rather than the last tenant’s.
Light, Power & Emergency
General light and power, switching and controls, plus emergency and exit lighting to AS 2293 with the six-monthly logbook opened on day one.
Structured Data, MDF & IDF
Comms room build-out, floor IDFs, Cat6A and fibre backbone, patching, labelling to AS/NZS 3080 and Fluke certification results handed over as a file, not a promise.
AV, CCTV & Security
Meeting room and signage cabling, and the containment, power and data behind cameras, access control and alarms — terminated and tested ready for the security integrator.
Offices, Retail, Hospitality and Warehouses
Four building types, four sets of constraints — and the same contractor across the electrical, the data and the security on all of them.

Open-Plan Office Fit-Out

Retail & Hospitality Lighting

Warehouse High-Bay Lighting

Base Build & Shell Handover
Fit-Out Questions
What builders, tenants and project managers ask before awarding the package.
Pricing a Fit-Out?
Send the drawings and the services matrix and you will get a tendered price with the provisional sums called out honestly.