24/7 Sydney Emergency Sparky
0405 353 236
Commercial Fit-OutsElectrical, Data & Security

Commercial Fit-Out Electrical & Data

Offices, retail, hospitality venues and warehouses — one contractor for the distribution, the general light and power, the structured data with its MDF and IDF racks, the audio visual, and the electrical and data behind CCTV and access control.

  • One Contractor, Every Service
  • Programmed to the Build
  • Certified for Handover
Call 0405 353 236
Completed office fit-out in Sydney with exposed services and glazed partitionsTenancy Fit-Out
Priced from Drawings (tendered, not estimated)Defect-Free Handover
Where Fit-Outs Lose Time

The Three Things That Delay a Handover

A fit-out rarely runs late because of cable. It runs late because of coordination, and all three of these are decided before anybody pulls a draw wire.

!

Four Trades, Four Contractors

Power, data, audio visual and security split across separate contractors means four programmes, four sets of containment fighting for the same ceiling space, and nobody accountable when the comms room is not ready for the racks.

!

Base Build Capacity Assumed, Not Checked

A tenancy taking more load than the base build allows for is discovered at commissioning, when the answer is a supply upgrade on the critical path. It is a metering and maximum demand question that has an answer during design.

!

Certification Left to the End

Emergency lighting logbooks, Fluke test results, as-builts and the CCEW all arrive at handover or they hold it up. Producing them stage by stage is the difference between a defect list and a set of keys.

Every Service a Tenancy Needs

Scoped from the drawings, programmed against the builder’s dates, and delivered by one contractor who answers for all of it.

Commercial tenancy fit-out in progress, partition framing and a floor conduit stub

Distribution & Sub-Mains

Tenancy boards, sub-mains and metering for separately billed suites, sized against a real maximum demand calculation rather than the last tenant’s.

Light, Power & Emergency

General light and power, switching and controls, plus emergency and exit lighting to AS 2293 with the six-monthly logbook opened on day one.

Structured Data, MDF & IDF

Comms room build-out, floor IDFs, Cat6A and fibre backbone, patching, labelling to AS/NZS 3080 and Fluke certification results handed over as a file, not a promise.

AV, CCTV & Security

Meeting room and signage cabling, and the containment, power and data behind cameras, access control and alarms — terminated and tested ready for the security integrator.

Offices, Retail, Hospitality and Warehouses

Four building types, four sets of constraints — and the same contractor across the electrical, the data and the security on all of them.

  • Open-Plan Office Fit-Out

    Open-Plan Office Fit-Out

  • Retail & Hospitality Lighting

    Retail & Hospitality Lighting

  • Warehouse High-Bay Lighting

    Warehouse High-Bay Lighting

  • Base Build & Shell Handover

    Base Build & Shell Handover

Fit-Out Questions

What builders, tenants and project managers ask before awarding the package.

Yes, and that is the point of the package. Power, structured data, audio visual, and the electrical and data work behind CCTV and access control are one scope with one programme. Where a specialist security integrator is appointed we terminate to their equipment and test to the boundary rather than duplicating their work.

Pricing a Fit-Out?

Send the drawings and the services matrix and you will get a tendered price with the provisional sums called out honestly.

Speak to the estimator: 0405 353 236
Available Now • 24/7 DispatchNSW Lic #456652C
Call 0405 353 236